|
|
|
| | | | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |
Reference list – ОTHER WORKS |
No. |
STRUCTURE |
CHARACTERISTICS |
1. |
Gasline Uzice, route Preljina - Uzice, RG08-10 and RG08-16 |
L=44.136 km |
2. |
Construction of parking at Zlatibor |
P=5,279.40 m2 |
3. |
Reconstruction and construction of infrastructure at border crossing point Presevo |
L= 850 m | | |
| |
© Putevi a.d. - Užice | designed & produced by MASSVision, powered by cMASS |